When you shortlist two or three factories, each sends a certificate and each says it is "certified". The certificates may be for different schemes, held by different parties, scoped to different models and filed by different people. The useful comparison is a table with the same columns for every supplier, filled from the documents themselves — because the cheapest certificate that does not cover your model is the most expensive one.
In short
- Same market, same scheme. Compare only certificates for the destination you are actually shipping to; a CE document says nothing about SIRIM or SNI.
- Holder and factory are different columns. The holder answers "who is responsible", the factory answers "where it was made". Both must match your chain.
- Model coverage decides. A certificate for a 9 L oven does not cover a 45 L oven unless the scope says so.
- Who files matters as much as who holds. In Malaysia the importer holds the CoA; in Indonesia the applicant registers; in the Philippines the clearance is per shipment.
- Ask for the test report, not only the certificate. The report shows what was tested; the certificate shows what was approved.
The comparison table to build
| Column | What to fill in | Why it decides the choice |
|---|---|---|
| Market and scheme | e.g. Malaysia ST CoA, Indonesia SNI + NPB, EU CE | A certificate for another market is not evidence |
| Holder | Legal entity named on the certificate | Must match who will hold the approval or supply the file |
| Factory / site | Manufacturing site in the scope | Production moved elsewhere can void the basis |
| Models covered | Model references and variants | Your invoice model must appear in the list |
| Ratings | Voltage, frequency, plug, power | Wrong rating means the tested configuration differs |
| Standard and edition | Standard number and year | Superseded standards may not be accepted |
| Validity and surveillance | Expiry, audit or surveillance conditions | A valid date does not guarantee current compliance |
| Who files / who pays | Importer, applicant, licence holder | Determines the practical work after the order |
Which certificate is better in each market
| Market | Who holds the approval | What to compare |
|---|---|---|
| Malaysia | Importer holds the CoA; SIRIM tests and labels | Factory test report for the exact model and rating; importer readiness to apply |
| Indonesia | Applicant registers SNI; NPB and SKEM/LTHE sit alongside | Model registration and the applicant's ability to file |
| Vietnam | Designated certification body; importer files the declaration | QCVN reports and the conformity declaration package |
| Thailand | Thai-registered licence holder; TIS mark | Licence scope, factory inspection readiness and label |
| Philippines | Clearance per shipment (ICC) | Whether the factory's test reports are current and complete |
| European Union | Manufacturer's declaration; technical file | Test reports, risk assessment and the technical file |
| United States | NRTL listing plus FCC / DOE as applicable | Listing scope, FCC ID, DOE compliance |
Red flags when comparing certificates
- The certificate names a different company as holder, and the supplier says it is the same group.
- The model list shows a similar model with a different suffix.
- The voltage or plug in the report is not the one you are importing.
- The certificate is expired, or the standard edition has been replaced.
- The document is a screenshot or a photo of a PDF, and no certificate number can be checked with the issuer.
- "Certification in progress" presented as certification.
- The certificate covers a different factory address from the one on the quotation.
Questions to send each factory
- Which market and scheme is this certificate for, and who is the holder?
- Which factory site is in scope, and is that the site producing my order?
- Which model references and ratings are covered?
- Which standard and edition does it cite, and when does it expire?
- Can you send the full test report for my model, not just the certificate?
- Who files the application or declaration in the destination market — you or me?
The decision rule
Do not compare prices until the certificates are comparable. Line up the same columns for every supplier, mark the rows where the document does not match your shipment, and price the difference: a scope extension, a new test or an importer-held approval is real work with real lead time. The factory whose certificate already covers your model is usually cheaper once that work is counted — even when its unit price is not the lowest.
Buyer questions
Both factories sent certificates. Can I just pick the cheaper one?
Not until you know whether the certificates cover your model, your factory and your market. Price the work needed to close any gap — a scope extension, a new test, or an approval held in your name — and compare the total.
One factory has a certificate, the other says it can get one. Which is better?
The one whose certificate already covers your model and whose factory site is in scope is usually better, because the work is done. A promise to certify is a promise about future work and future lead time; treat it as such until the certificate exists.
How can I check a certificate is real?
Use the issuer's register or contact the issuer directly with the certificate number. Compare the holder, factory, model list and standard with the document you were sent. A PDF alone is not verification.
What if the certificate is held by the factory but the approval must be in my name?
That is normal in several markets — Malaysia's CoA is held by the importer. In that case the factory's job is the test report and the technical file; your job is the application. Compare suppliers on how complete and current that file is, not on who holds a certificate that you cannot use directly.
Do I need to compare certificates for every item in a mixed container?
Yes, per item and per HS code. Each product has its own scope. A container can hold one item that is fully covered and another that needs a new test, and the second item decides the shipment.
Primary sources
Checked 2026-11-17. Rules change; verify with the authority before you ship.
- Suruhanjaya Tenaga (Malaysia) — Certificate of Approval
- SIRIM QAS International — certification and testing
- BPS Philippines — products under mandatory certification
- European Commission — CE marking
- U.S. FCC — equipment authorization
Ask about your product
Not sure whether this applies to what you are buying? Send the specification and we will tell you what has to be in whose name — request a quote, or email sales@xinhuichuan.com.